+ Reply to Thread
Results 1 to 3 of 3

Thread: Trialer Galvanizing coming along

  1. #1
    Join Date
    May 2004
    Posts
    255

    Default Trialer Galvanizing coming along

    I picked up my trailer frame and parts from Calwest Galvanizing on Thursday. Loading the frame onto the trailer was drama free so it was all good. The road trips in and out of Long Beach wasn't to bad either. The tab for the stripping sandblasting and galvanizing came out to $1010, which was a little less than I thought it was going to be.

    Reassembly is going a little slower than I would like but its coming along.

    Attached Thumbnails Attached Thumbnails Click image for larger version

Name:	Trailer Frame Galvanized.jpg‎
Views:	410
Size:	98.2 KB
ID:	195  
    Last edited by NoSlack; 07-24-2016 at 10:31 AM.
    Brian on Old Blue, out

  2. #2
    Join Date
    Apr 2004
    Location
    Spring Valley
    Posts
    2,692

    Default

    Get off the computer and get back on your tools. The fish are 5-10 of the beach.
    NoSlack-------------------------------------------<'(((>{

  3. #3
    Join Date
    May 2004
    Posts
    255

    Default

    Ya I hear you Mike.
    I still have some trailer wiring, winch stand and brake issues but it's 90% done. The plan is to reload it and fit the bunks to it on wed am.

    Now if the diver cleaning my hull on Monday can get me my 12 knots back I'll be doing the happy dance.
    Brian on Old Blue, out

+ Reply to Thread

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

     

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts